KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  7-19-2007
Number of Hours:  8.00
Manual Reference:  8.x
Brief Description:  Cleaning, abrading, alodining, priming and rivetin

I started the day by edge finishing the step flanges and preparing the steps for priming. Then I cleaned, abraded, alodined and primed the rudder pedals, rudder cable links, rudder stops, rudder pedal brace, control column mounts, elevator bellcrank and the F-665, F-790, F-789 pushrods. Once the primer was dry I riveted the rudder pedals, elevator bellcrank and pushrods.
' style=

Cleaned, abraded, alodined, primed and assembled various parts

Cleaned, abraded, alodined, primed and assembled various parts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.